Remove the solenoid nut (Item 1) [Figure 20-90-9].
Installation: Tighten the nut to 60 in.-lbs. (6,78 Nm) torque.
Remove the solenoid (Item 1) and the solenoid stem (Item 2) [Figure 20-90-10].
Installation: Tighten the solenoid stem to 30-35 ft.-lbs.
(40,8-47,6 Nm) torque.
Remove the flow adjustment valve and O-ring (Item 1) [Figure 20-90-11]
NOTE: Always install new O-rings before any parts are installed into the valve. Check the parts for wear or damage and replace as needed.
Remove the plug [Figure 20-90-12].
Remove the plug (Item 1), and flow control spool (Item 2) [Figure 20-90-13].
Check the flow control spool for wear, check the O-ring on the plug and replace as needed.
Remove the tilt cylinder check valve (Item 1) spring (Item 2) and plug (Item 3) [Figure 20-90-14]. Check for wear, check the O-ring and replace as needed.
Remove the plug [Figure 20-90-15].
Remove the plug (Item 1), spring (Item 2) and unloading spool (Item 3) [Figure 20-90-16].
Check all parts and replace as needed. Install a new O-ring on the plug before installing.
Reverse the dissasembly procedure to assemble the bucket position valve.