Lower the work group to the ground.
With the engine off, turn the key to the ON position and move both hydraulic control levers to relieve hydraulic pressure.
Support the boom with a chain hoist (Item 1) [Figure 20-20-7].
Remove the boom shield bolt (Item 1), washer (Item 2), spring washer and spacer (Item 3) [Figure 20-20-8].
Slide the shield (Item 1) off of the bracket (Item 2) [Figure 20-20-9].
Remove the snap ring (Item 1) [Figure 20-20-10] and washer.
Remove the rod end pin (Item 2) [Figure 20-20-10].
Lower the cylinder (Item 1) [Figure 20-20-11] until it rests on a portable work stand.
Mark and remove the hose (Item 1) [Figure 20-20-12].
Remove the hose clamp bolt (Item 2) [Figure 20-20-12].
Remove the hose (Item 1) [Figure 20-20-13].
Remove the nuts (Item 1) and bolt (Item 2) [Figure 20-20-14].
Remove the pin (Item 1) [Figure 20-20-15] from the base end of the cylinder.
Remove the cylinder.