Place jackstands under the rear corners of the loader.
Raise the lift arms and install an approved lift arm support device. (See Installing on Page 10-20-1.)
Raise the operator cab. (See Raising on Page 10-30-2.)
Disconnect the negative (-) cable from the battery.
Disconnect the red wire (Item 1) [Figure 60-30-7] from the alternator which comes from the battery.
Disconnect the wiring harness connector (Item 2) [Figure 60-30-7] from the alternator.
Remove the adjustment bolt (Item 1) [Figure 60-30-8] from the mounting bracket.
Remove the alternator belt (Item 2) [Figure 60-30-8] from the alternator pulley.
Remove the mounting bolt (Item 3) [Figure 60-30-8].