Remove the arm. (See Removal And Installation on Page 40-160-1.) Remove the boom cylinder. (See Removal And Installation on Page 20-20-3.) Disconnect the wire harness…
Apply a film of grease to the outer diameter of the bushing and to the inner diameter of the casting. Center the bushing on the…
The following parts will be needed for removal and installation of the swing frame bushings: 1. Bolt – 19 x 153 mm or (3/4 x…
Route the hoses through the swing frame as follows [Figure 40-140-12]: 1. Female Quick Coupler 2. Male Quick Coupler 3. Arm Rod End Hose 4.…
Rotate the upperstructure so the blade is to the rear of the excavator. Remove the arm. (See Removal And Installation on Page 40-160-1.) Remove the…
Open the right side cover. Disconnect the wire harness (Item 1) [Figure 40-130-1]. Remove the nut (Item 2) [Figure 40-130-1] and remove the horn.
Remove the floor mat and center floor plate. (See Removal And Installation on Page 40-110-1.) Remove the left upperstructure cover. (See Removal And Installation on…
Lift up on and remove the floor mat (Item 1) [Figure 40-110-1]. Lift up on and remove the floor plate (Item 1) [Figure 40-110-2]. Remove…
Remove the bolts (Item 1) [Figure 40-100-2]. Installation: Tighten the bolts to 43 – 47 Nโขm (32 – 35 ft-lb) torque. Remove the clip (Item…
Remove the bolts (Item 1) [Figure 40-100-1]. Installation: Tighten the bolts to 43 – 47 Nโขm (32 – 35 ft-lb) torque.