Lift and block the loader. (See Procedure on Page 10-10-1.)
Raise the lift arms and install an approved lift arm support device. (See Installing on Page 10-20-1.)
Raise the operator cab. (See Raising on Page 10-30-2.)
Clean the area around the control valve.
Drain the hydraulic reservoir. (See Removing And Replacing Hydraulic Fluid on Page 10-120-2.)
Remove the control panel. (See Removal and Installation on Page 50-100-2.)
Remove the right rear tire.
Locate and remove the access covers (Item 1) [Figure 20-41-2] on the right side of the machine.
Mark all tubelines and hoses for correct installation.
The fixed end main valve hose (Item 1) [Figure 20-41-3] is connected to a fixed end fitting on the control valve.
The hose is routed to the back upright where the hose is connected to a tee fitting that feeds the base end of both lift cylinders. The hose must be removed at the back tee fitting, located in the right side upright.
NOTE: Remember the hose routing for ease of control valve installation.
Disconnect the inlet tubeline (Item 1) from the control valve (Item 2) [Figure 20-41-4] through the access opening.
Remove the tie-straps (Item 1) [Figure 20-41-5] from the fixed end main valve hose.
Mark and disconnect the three electric solenoid connectors (Item 1) [Figure 20-41-6] for correct installation.
Remove the outlet tubeline (Item 2) [Figure 20-41-6] from the control valve to the hydraulic oil cooler.
Disconnect and cap the drain hose (Item 3) [Figure 20-41-6].
Disconnect and remove the tubeline (Item 1) [Figure 20-41-7] from the lift arm bypass valve to the control valve.
Disconnect and cap the hose (Item 2) [Figure 20-41-7] from the lift arm bypass valve to the drive motor case drain.
Disconnect and cap the lift arm bypass tubeline (Item 3) [Figure 20-41-7].
Disconnect the connectors (Item 1) [Figure 20-41-8] from the lift and tilt actuators.
Remove the two lift arm bypass valve mounting bolts (Item 1) [Figure 20-41-9].
Remove the lift arm bypass valve and mounting bracket.
Remove tubeline clamp bolt (Item 1) [Figure 20-41-10] from the auxiliary tubelines in the left rear upright.
Installation: Tighten bolt to 15 – 20 ft.-lb. (20 – 27 Nโขm) torque.
Remove and cap both tubelines (Item 1) [Figure 20-41-11] from the auxiliary section of the control valve.
Disconnect and cap the tubeline (Item 1) [Figure 20-41-12] from the lift section of the control valve.
Disconnect and cap the tubelines (Item 1) and (Item 2) [Figure 20-41-13] from the tilt section of the control valve.
Remove the fixed-end main valve hose (Item 1) [Figure 20-41-14] from the main control valve fitting.
Connect a hoist to the lifting brackets (Item 1) [Figure 20-41-15] on the control valve.
Remove the two mounting bolts (Item 1) [Figure 20-41-16] fastening the control valve to the side of the loader.
Remove the control valve from the loader.
Reverse procedure for installation.