BOBCAT S130 – HYDRAULIC CONTROL VALVE (ACS) OR (SJC) – Removal And Installation

Lift and block the loader. (See Procedure on Page 10-10-1.)

Raise the lift arms and install an approved lift arm support device. (See Installing on Page 10-20-1.)

Raise the operator cab. (See Raising on Page 10-30-2.)

Clean the area around the control valve.

Drain the hydraulic reservoir. (See Removing And Replacing Hydraulic Fluid on Page 10-120-2.)

Remove the control panel. (See Removal and Installation on Page 50-100-2.)

Remove the right rear tire.

Locate and remove the access covers (Item 1) [Figure 20-41-2] on the right side of the machine.

Mark all tubelines and hoses for correct installation.

The fixed end main valve hose (Item 1) [Figure 20-41-3] is connected to a fixed end fitting on the control valve.

The hose is routed to the back upright where the hose is connected to a tee fitting that feeds the base end of both lift cylinders. The hose must be removed at the back tee fitting, located in the right side upright.

NOTE: Remember the hose routing for ease of control valve installation.

Disconnect the inlet tubeline (Item 1) from the control valve (Item 2) [Figure 20-41-4] through the access opening.

Remove the tie-straps (Item 1) [Figure 20-41-5] from the fixed end main valve hose.

Mark and disconnect the three electric solenoid connectors (Item 1) [Figure 20-41-6] for correct installation.

Remove the outlet tubeline (Item 2) [Figure 20-41-6] from the control valve to the hydraulic oil cooler.

Disconnect and cap the drain hose (Item 3) [Figure 20-41-6].

Disconnect and remove the tubeline (Item 1) [Figure 20-41-7] from the lift arm bypass valve to the control valve.

Disconnect and cap the hose (Item 2) [Figure 20-41-7] from the lift arm bypass valve to the drive motor case drain.

Disconnect and cap the lift arm bypass tubeline (Item 3) [Figure 20-41-7].

Disconnect the connectors (Item 1) [Figure 20-41-8] from the lift and tilt actuators.

Remove the two lift arm bypass valve mounting bolts (Item 1) [Figure 20-41-9].

Remove the lift arm bypass valve and mounting bracket.

Remove tubeline clamp bolt (Item 1) [Figure 20-41-10] from the auxiliary tubelines in the left rear upright.

Installation: Tighten bolt to 15 – 20 ft.-lb. (20 – 27 Nโ€ขm) torque.

Remove and cap both tubelines (Item 1) [Figure 20-41-11] from the auxiliary section of the control valve.

Disconnect and cap the tubeline (Item 1) [Figure 20-41-12] from the lift section of the control valve.

Disconnect and cap the tubelines (Item 1) and (Item 2) [Figure 20-41-13] from the tilt section of the control valve.

Remove the fixed-end main valve hose (Item 1) [Figure 20-41-14] from the main control valve fitting.

Connect a hoist to the lifting brackets (Item 1) [Figure 20-41-15] on the control valve.

Remove the two mounting bolts (Item 1) [Figure 20-41-16] fastening the control valve to the side of the loader.

Remove the control valve from the loader.

Reverse procedure for installation.