If the charge pressure is not correct loosen the charge relief valve plug (Item 1) [Figure 30-40-6]. Assembly: Always use a new O-ring. Tighten the…
Category: BOBCAT S130
Disconnect the charge pressure sender connector (Item 1) [Figure 30-40-5] from the sender. Remove the sender (Item 2) [Figure 30-40-5] from the adapter fitting. Installation:…
The tools needed to check charge pressure, hydraulic hose (Item 1), Hydraulic gauge (1000 PSI) (Item 2) and adapter fitting (P/N 93F-5) (Item 3) [Figure…
Charge pressure is a supply of oil to the hydrostatic pumps. Charge pressure is regulated by a charge relief valve located inside the hydrostatic pump.…
It is necessary to locate or fabricate a press tool for this procedure. Refer to [Figure 30-31-11] for the correct dimensions of the tool needed.…
Raise the loader lift arms and install an approved lift arm support device. (See Installing on Page 10-20-1.) Lift and block the loader. (See Procedure…
The tool listed is necessary for the following procedure: MEL1420 – Carrier Seal Tool Remove the hydrostatic motor. (See Removal And Installation on Page 30-20-1.)…
The hydrostatic motor carrier is the mating connection from the hydrostatic drive motor to the transmission case. The hydrostatic motor carrier contains a shaft that…
It is necessary to locate or fabricate a press tool for this procedure. Refer to [Figure 30-30-11] for the correct dimensions of the tool needed.…